What is your production lead time?
What is your production lead time?
Our production lead time depends on the box type, order quantity, materials, and finishing processes. As all of our packaging boxes are custom-made, lead time may vary from project to project. However, we always provide a clear and reliable timeline before confirming your order.
Typical Production Lead Time
For most custom high-end packaging boxes, the standard production lead time is:
- Sampling: 5–7 working days, depending on complexity
- Mass production: 20–30 working days after sample approval
This timeline ensures stable quality control, accurate color matching, and consistent finishing results, which are essential for premium packaging.
What Factors Affect Production Time?
Several factors can influence the overall production schedule:
- Box structure: Complex structures may require additional processing time
- Materials: Specialty paper or custom materials may have longer sourcing time
- Finishing techniques: Hot stamping, embossing, debossing, or multiple finishes can extend production
- Order quantity: Larger volumes may require more production days
- Artwork confirmation: Delays in artwork approval can affect the schedule
Industry Insight: In high-end packaging, production lead time is not only about speed but also about consistency and craftsmanship. A realistic timeline helps avoid quality risks.
Rush Orders & Tight Deadlines
If you have a tight deadline for a product launch or promotional campaign, please let us know in advance. Depending on the project details, we may be able to:
- Optimize the production schedule
- Suggest alternative materials or finishes
- Split shipments to meet critical deadlines
Rush orders are evaluated on a case-by-case basis to ensure quality is not compromised.
Production Timeline Transparency
Before mass production begins, we provide a confirmed production schedule covering:
- Sample preparation and approval
- Material sourcing
- Printing and finishing
- Final inspection and packing
Shipping Time (After Production)
Please note that shipping time is separate from production lead time. Shipping duration depends on destination and shipping method (air, sea, or express). Our team can advise the most suitable shipping option based on your timeline and budget.
Summary:
- Sampling: typically 5–7 working days
- Mass production: typically 20–30 working days after sample approval
- Lead time varies based on structure, materials, and finishing
- Rush options may be available upon request